Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,142
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0074 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $110 | $0 | Implemented |
MZ0074 # 07 Y:2011 | 07 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,840 | $0 | Implemented |
MZ0063 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $232 | $480 | Implemented |
MZ0063 # 02 Y:2011 | 02 | 2011 | ADJUST VENTS TO MINIMIZE ENERGY USE | $1,007 | $240 | Implemented |
MZ0063 # 03 Y:2011 | 03 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $886 | $3,000 | Implemented |
MZ0063 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,168 | $1,200 | Implemented |
MZ0063 # 06 Y:2011 | 06 | 2011 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,235 | $2,700 | Implemented |
MZ0062 # 01 Y:2011 | 01 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,242 | $1,160 | Implemented |
MZ0062 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,772 | $49,280 | Implemented |
MZ0062 # 04 Y:2011 | 04 | 2011 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,360 | $100 | Implemented |
MZ0062 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,441 | $1,300 | Implemented |
MZ0062 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,105 | $15,000 | Implemented |
MZ0062 # 09 Y:2011 | 09 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,053 | $9,000 | Implemented |
MZ0062 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,836 | $10,000 | Implemented |
MZ0062 # 13 Y:2011 | 13 | 2011 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $91 | $300 | Implemented |
MZ0062 # 14 Y:2011 | 14 | 2011 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $11,657 | $150,000 | Implemented |
MZ0062 # 16 Y:2011 | 16 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $11,500 | $18,000 | Implemented |
MZ0058 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,229 | $41,660 | Implemented |
MZ0058 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,522 | $22,400 | Implemented |
MZ0058 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $422,776 | $140,000 | Implemented |
MZ0058 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,085 | $1,300 | Implemented |
MZ0058 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,916 | $0 | Implemented |
MZ0061 # 01 Y:2010 | 01 | 2010 | USE OPTIMUM THICKNESS INSULATION | $145 | $300 | Implemented |
MZ0061 # 02 Y:2010 | 02 | 2010 | USE OPTIMUM THICKNESS INSULATION | $79 | $1,200 | Implemented |
MZ0061 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $36,947 | $2,160 | Implemented |