Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74,810
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0240 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $977 | $113 | Implemented |
UU0240 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $544 | $1,387 | Implemented |
WM0210 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,808 | $1,400 | Implemented |
WM0210 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,410 | $7,096 | Implemented |
SF0613 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,003 | $100 | Implemented |
SF0613 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,636 | $2,272 | Implemented |
SF0613 # 03 Y:2024 | 03 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $16,386 | $2,278 | Implemented |
SF0613 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,117 | $3,083 | Implemented |
SF0613 # 05 Y:2024 | 05 | 2024 | INSULATE FEEDWATER TANK | $1,576 | $1,977 | Implemented |
SF0613 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $466 | $1,170 | Implemented |
SF0613 # 07 Y:2024 | 07 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,789 | $52,101 | Implemented |
SF0613 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,505 | $22,063 | Implemented |
SF0613 # 09 Y:2024 | 09 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,729 | $28,430 | Implemented |
SF0613 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $141,513 | $823,750 | Implemented |
MZ0355 # 07 Y:2023 | 07 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,043 | $320 | Implemented |
SU0545 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $669 | $83 | Implemented |
OR0785 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $323 | $0 | Implemented |
MZ1000 # 04 Y:2023 | 04 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,463 | $900 | Implemented |
MZ1000 # 05 Y:2023 | 05 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $2,995 | $2,131 | Implemented |
MZ1000 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,061 | $1,100 | Implemented |
WV0656 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $8,319 | $1,861 | Implemented |
WV0656 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,117 | $9,888 | Implemented |
WV0656 # 07 Y:2023 | 07 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,997 | $1,500 | Implemented |
WV0656 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,912 | $637 | Implemented |
WV0656 # 10 Y:2023 | 10 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,265 | $1,350 | Implemented |