IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,672

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
UF0596 # 02 Y:2023 02 2023 INSTALL SUB-METERING EQUIPMENT $266,539 $15,232 Implemented
UF0596 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $232,670 $300,000 Implemented
UF0596 # 04 Y:2023 04 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $213,087 $0 Implemented
UF0596 # 05 Y:2023 05 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $145,162 $141,225 Implemented
UF0596 # 06 Y:2023 06 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $50,904 $49,563 Implemented
UF0596 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,000 $171,903 Implemented
UF0596 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,499 $1,399 Implemented
UF0596 # 09 Y:2023 09 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,289 $25,440 Implemented
UF0596 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $26,447 $4,768 Implemented
UF0596 # 11 Y:2023 11 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,156 $2,352 Implemented
UF0595 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $39,683 $20,785 Implemented
UF0595 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,931 $25,400 Implemented
UF0595 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,458 $356 Implemented
UF0595 # 06 Y:2023 06 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,957 $3,276 Implemented
UF0595 # 07 Y:2023 07 2023 INSTALL SUB-METERING EQUIPMENT $1,589 $4,340 Implemented
UF0595 # 08 Y:2023 08 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,317 $5,838 Implemented
UF0595 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $1,092 $2,160 Implemented
UF0595 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $20,697 $4,480 Implemented
MI0424 # 01 Y:2023 01 2023 INCREASE EFFICIENCY OF TRUCKS $32,721 $6,400 Implemented
MI0424 # 02 Y:2023 02 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,951 $120 Implemented
MI0424 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,328 $0 Implemented
MI0424 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,147 $118 Implemented
MI0424 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $375 $1,215 Implemented
UF0594 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,181 $6,536 Implemented