IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1901 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,368 $13,023 Implemented
CL1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,631 $52,880 Implemented
CL1806 # 06 Y:2018 06 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,909 $0 Implemented
CL1805 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $13,011 Implemented
CL1805 # 01 Y:2018 01 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,691 $506,862 Implemented
CL1804 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $39,409 $3,050 Implemented
CL1804 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,306 $184,601 Implemented
CL1804 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156,853 $28,500 Implemented
CL1803 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $386 $0 Implemented
CL1803 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,656 $2,080 Implemented
CL1803 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,516 $9,852 Implemented
CL1803 # 01 Y:2018 01 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $40,277 $14,300 Implemented
CL1704 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,811 $21,000 Implemented
CL1704 # 02 Y:2017 02 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $11,470 $15,000 Implemented
CL1703 # 04 Y:2017 04 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,100 $2,000 Implemented
CL1703 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,843 $0 Implemented
CL1703 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,383 $20,450 Implemented
CL1701 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515 Implemented
CL1701 # 05 Y:2017 05 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500 Implemented
CL1701 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650 Implemented
CL1701 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,942 $10,000 Implemented
NC0582 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,269 $199,760 Implemented
NC0582 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $38,581 $20,000 Implemented
NC0582 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $8,560 $17,350 Implemented
NC0582 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $1,021 $500 Implemented