Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,410
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0096 # 01 Y:1987 | 01 | 1987 | INSULATE BARE EQUIPMENT | $1,581 | $551 | Implemented |
MA0096 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $402 | $78 | Implemented |
MA0096 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,922 | $746 | Implemented |
MA0096 # 07 Y:1987 | 07 | 1987 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $22,563 | $4,750 | Implemented |
MA0092 # 01 Y:1987 | 01 | 1987 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $766 | $500 | Implemented |
MA0092 # 02 Y:1987 | 02 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,458 | $425 | Implemented |
MA0093 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,938 | $785 | Implemented |
MA0093 # 03 Y:1987 | 03 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $916 | $250 | Implemented |
MA0093 # 04 Y:1987 | 04 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,650 | $0 | Implemented |
MA0093 # 06 Y:1987 | 06 | 1987 | REPAIR OR REPLACE STEAM TRAPS | $940 | $900 | Implemented |
MA0094 # 01 Y:1987 | 01 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,500 | $480 | Implemented |
MA0094 # 02 Y:1987 | 02 | 1987 | REPAIR OR REPLACE STEAM TRAPS | $1,541 | $600 | Implemented |
MA0094 # 03 Y:1987 | 03 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,184 | $9,600 | Implemented |
MA0094 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,442 | $406 | Implemented |
MA0094 # 06 Y:1987 | 06 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $860 | $0 | Implemented |
MA0086 # 02 Y:1987 | 02 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,778 | $47,000 | Implemented |
MA0087 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,536 | $1,350 | Implemented |
MA0078 # 01 Y:1986 | 01 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,650 | $2,760 | Implemented |
MA0078 # 03 Y:1986 | 03 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,530 | $3,500 | Implemented |
MA0078 # 05 Y:1986 | 05 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $827 | $240 | Implemented |
MA0078 # 06 Y:1986 | 06 | 1986 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,610 | $22,000 | Implemented |
MA0080 # 01 Y:1986 | 01 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,100 | $3,000 | Implemented |
MA0080 # 02 Y:1986 | 02 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $44,537 | $600 | Implemented |
MA0081 # 02 Y:1987 | 02 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $810 | $1,400 | Implemented |
MA0081 # 03 Y:1987 | 03 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,831 | $800 | Implemented |