Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,681
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0225 # 03 Y:2012 | 03 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $27,049 | $190,339 | Implemented |
MI0225 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,052 | $1,660 | Implemented |
MI0225 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $13,619 | $520 | Implemented |
MI0225 # 09 Y:2012 | 09 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,598 | $80 | Implemented |
MI0225 # 10 Y:2012 | 10 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,046 | $255 | Implemented |
MI0224 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,266 | $11,960 | Implemented |
MI0224 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,947 | $12,324 | Implemented |
MI0224 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,323 | $3,480 | Implemented |
MI0224 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,660 | Implemented |
MI0224 # 06 Y:2012 | 06 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $996 | $2,594 | Implemented |
MI0224 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $1,962 | $520 | Implemented |
MI0224 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,668 | $80 | Implemented |
MI0224 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,230 | Implemented |
MI0223 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,207 | $2,520 | Implemented |
MI0223 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,660 | Implemented |
MI0223 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,824 | $4,510 | Implemented |
MI0223 # 10 Y:2012 | 10 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,496 | $1,800 | Implemented |
MI0223 # 11 Y:2012 | 11 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $401 | $1,103 | Implemented |
MI0221 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,726 | $1,800 | Implemented |
MI0221 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,561 | $1,660 | Implemented |
MI0221 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,281 | $11,600 | Implemented |
MI0221 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,238 | $80 | Implemented |
MI0221 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,479 | $1,075 | Implemented |
MI0220 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,778 | $1,800 | Implemented |
MI0220 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,280 | $1,660 | Implemented |