IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0136 # 16 Y:1984 16 1984 RECOVER WASTE HEAT FROM EQUIPMENT $699 $350 Implemented
KU0136 # 18 Y:1984 18 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $550 Implemented
KU0136 # 19 Y:1984 19 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $387 $120 Implemented
KU0136 # 20 Y:1984 20 1984 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $219 $400 Implemented
KU0136 # 21 Y:1984 21 1984 IMPROVE LUBRICATION PRACTICES $2,590 $2,550 Implemented
KU0136 # 23 Y:1984 23 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $795 $0 Implemented
KU0137 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,839 $0 Implemented
KU0137 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $0 Implemented
KU0137 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $50 Implemented
KU0137 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Implemented
KU0138 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,748 $0 Implemented
KU0138 # 02 Y:1984 02 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $250 Implemented
KU0138 # 03 Y:1984 03 1984 INSTALL SET-BACK TIMERS $1,100 $0 Implemented
KU0138 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,807 $200 Implemented
KU0138 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $661 $0 Implemented
KU0138 # 12 Y:1984 12 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $884 $120 Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented
KU0129 # 10 Y:1984 10 1984 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $5,557 $300 Implemented
KU0129 # 12 Y:1984 12 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $3,565 Implemented
KU0129 # 13 Y:1984 13 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,710 $960 Implemented
KU0129 # 15 Y:1984 15 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $495 $500 Implemented