IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0416 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $0 Implemented
SF0377 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $0 Implemented
SF0376 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $397 $535 Implemented
SF0376 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,155 $110,307 Implemented
SF0376 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,011 $6,725 Implemented
SF0376 # 04 Y:2009 04 2009 AVOID FROST FORMATION ON EVAPORATORS $2,865 $9,600 Implemented
SF0376 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,149 $75,000 Implemented
SF0375 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,246 $0 Implemented
SF0375 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $2,383 $460 Implemented
SF0375 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,147 $244,092 Implemented
SF0375 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $10,418 $41,832 Implemented
SF0375 # 09 Y:2009 09 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,842 $12,018 Implemented
SF0375 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $9,983 $67,481 Implemented
SF0374 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $45,410 $0 Implemented
SF0374 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,699 $0 Implemented
SF0374 # 03 Y:2009 03 2009 REDUCE EXCESSIVE BOILER BLOWDOWN $10,627 $2,372 Implemented
SF0374 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,963 $2,837 Implemented
SF0374 # 05 Y:2009 05 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,402 $3,037 Implemented
SF0374 # 06 Y:2009 06 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,888 $9,574 Implemented
SF0374 # 07 Y:2009 07 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,939 $12,500 Implemented
SF0374 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,237 $33,968 Implemented
SF0374 # 09 Y:2009 09 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $51,835 $40,007 Implemented
SF0374 # 10 Y:2009 10 2009 USE PHOTOCELL CONTROLS $18,403 $18,196 Implemented
SF0374 # 11 Y:2009 11 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,553 $5,659 Implemented
SF0374 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,489 $4,385 Implemented