IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0559 # 03 Y:2016 03 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,003 $1,000 Implemented
NC0559 # 06 Y:2016 06 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,950 $25,000 Implemented
NC0559 # 07 Y:2016 07 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $34,146 $10,000 Implemented
NC0559 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,231 $2,000 Implemented
NC0559 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $320 Implemented
NC0559 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $1,339 $1,600 Implemented
NC0559 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $494 $347 Implemented
NC0559 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,085 $1,000 Implemented
NC0559 # 15 Y:2016 15 2016 DEVELOP A REPAIR/REPLACE POLICY $2,264 $4,256 Implemented
NC0556 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $59,808 $90,000 Implemented
NC0556 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,438 $12,000 Implemented
NC0556 # 05 Y:2015 05 2015 DEVELOP A REPAIR/REPLACE POLICY $1,836 $4,256 Implemented
NC0556 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,584 $8,350 Implemented
NC0556 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $578 $868 Implemented
NC0553 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $63,028 $500 Implemented
NC0553 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,894 $68,084 Implemented
NC0553 # 03 Y:2015 03 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,721 $1,206 Implemented
NC0553 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $160 Implemented
NC0553 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $432 $694 Implemented
NC0553 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $363 $1,170 Implemented
NC0553 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $5,143 $9,886 Implemented
NC0553 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,396 $200 Implemented
NC0553 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,035 $200 Implemented
TT0153 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,651 $225 Implemented
TT0153 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $3,000 Implemented