IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,142

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0298 # 10 Y:2020 10 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $756 $288 Implemented
MZ0298 # 11 Y:2020 11 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $77,234 $900 Implemented
MZ0300 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,598 $1,650 Implemented
MZ0300 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,784 $200 Implemented
MZ0297 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,041 $51,700 Implemented
MZ0297 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $7,129 $24,780 Implemented
MZ0297 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $320 $840 Implemented
MZ0297 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,880 $2,595 Implemented
MZ0297 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,857 $350 Implemented
MZ0297 # 08 Y:2020 08 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $397 $300 Implemented
MZ0295 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,599 $34,694 Implemented
MZ0295 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,700 $3,360 Implemented
MZ0295 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,272 $240 Implemented
MZ0295 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,280 $550 Implemented
MZ0295 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,658 $3,500 Implemented
MZ0295 # 08 Y:2020 08 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,561 $360 Implemented
MZ0295 # 09 Y:2020 09 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $675 $322 Implemented
MZ0293 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,827 $320 Implemented
MZ0293 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $6,782 Implemented
MZ0293 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,924 $910 Implemented
MZ0293 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,762 $88,053 Implemented
MZ0293 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $230 $780 Implemented
MZ0293 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $328,879 $538,653 Implemented
MZ0286 # 02 Y:2020 02 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,624 $9,088 Implemented
MZ0286 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,970 $2,000 Implemented