IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0345 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,852 $16,492 Implemented
SD0345 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,230 $1,650 Implemented
SD0344 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,981 $35,875 Implemented
SD0344 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,104 $440 Implemented
SD0344 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,399 $18,500 Implemented
SF0287 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,741 $0 Implemented
SF0287 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,664 $0 Implemented
SF0287 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,720 $0 Implemented
SF0287 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $697 $5,675 Implemented
LM0078 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,800 $1,220 Implemented
LM0078 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,717 $400 Implemented
LM0078 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,064 $264 Implemented
LM0078 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,504 $1,585 Implemented
LM0078 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $238 $142 Implemented
LM0078 # 08 Y:2004 08 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $150,678 $1,000 Implemented
LM0078 # 10 Y:2004 10 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $298,998 $56,840 Implemented
LM0078 # 11 Y:2004 11 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $69,741 $2,000 Implemented
SF0286 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $522 $0 Implemented
SF0286 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $1,697 $829 Implemented
SF0286 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $914 $4,363 Implemented
SF0286 # 07 Y:2004 07 2004 PURCHASE EQUIPMENT INSTEAD OF LEASING $5,000 $5,500 Implemented
LM0077 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $117 $0 Implemented
LM0077 # 03 Y:2004 03 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $91 $100 Implemented
LM0077 # 05 Y:2004 05 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $812 $0 Implemented
SF0285 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,525 $0 Implemented