IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,627

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0035 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,959 $4,000 Implemented
CO0035 # 05 Y:1985 05 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,596 $24 Implemented
CO0035 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,229 $6,000 Implemented
CO0035 # 07 Y:1985 07 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,638 $4,302 Implemented
CO0030 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,761 $300 Implemented
CO0030 # 02 Y:1985 02 1985 INSTALL TURBULATORS $4,405 $400 Implemented
CO0030 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,492 $3,000 Implemented
CO0030 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $5,420 $1,072 Implemented
CO0030 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $751 $400 Implemented
CO0030 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $200 Implemented
CO0030 # 08 Y:1985 08 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,640 $1,485 Implemented
CO0030 # 09 Y:1985 09 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,211 $350 Implemented
CO0031 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,774 $300 Implemented
CO0031 # 06 Y:1985 06 1985 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $920 $250 Implemented
CO0032 # 02 Y:1985 02 1985 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $816 $2,000 Implemented
CO0032 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,972 $3,600 Implemented
CO0032 # 06 Y:1985 06 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $596 $1,500 Implemented
CO0032 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $1,500 Implemented
CO0027 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,811 $219 Implemented
CO0027 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $150 Implemented
CO0027 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $100 Implemented
CO0027 # 04 Y:1985 04 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $698 $200 Implemented
CO0027 # 06 Y:1985 06 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,928 $750 Implemented
CO0028 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,738 $620 Implemented
CO0028 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,873 $150,000 Implemented