Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,628
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0273 # 10 Y:2003 | 10 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $166 | $45 | Implemented |
WV0272 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $12,184 | $721 | Implemented |
WV0272 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,265 | $980 | Implemented |
WV0272 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $4,369 | $621 | Implemented |
WV0272 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,533 | $9,240 | Implemented |
WV0272 # 07 Y:2003 | 07 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,209 | $1,789 | Implemented |
WV0272 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,519 | $675 | Implemented |
WV0272 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,390 | $200 | Implemented |
WV0272 # 12 Y:2003 | 12 | 2003 | USE SYNTHETIC LUBRICANT | $1,058 | $240 | Implemented |
WV0272 # 13 Y:2003 | 13 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,205 | $80 | Implemented |
UD0676 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,216 | $6,000 | Implemented |
UD0676 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $25,000 | Implemented |
UD0676 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,147 | $2,000 | Implemented |
UD0676 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $200 | Implemented |
UD0675 # 01 Y:2003 | 01 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $26,842 | $625 | Implemented |
UD0675 # 02 Y:2003 | 02 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $10,610 | $1,200 | Implemented |
UD0675 # 05 Y:2003 | 05 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,130 | $0 | Implemented |
UD0675 # 06 Y:2003 | 06 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,068 | $384 | Implemented |
UD0675 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,355 | $280 | Implemented |
UD0675 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $695 | $0 | Implemented |
UD0675 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $430 | $100 | Implemented |
UD0675 # 15 Y:2003 | 15 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $205 | $432 | Implemented |
UD0674 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,166 | $30,000 | Implemented |
UD0674 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $715 | $0 | Implemented |
UD0674 # 10 Y:2003 | 10 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $2,200 | Implemented |