IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0441 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,124 $1,980 Implemented
MI0441 # 03 Y:2024 03 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,427 $1,306 Implemented
MI0441 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,244 $186,000 Implemented
MI0441 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,377 $510 Implemented
MI0441 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $671 $1,203 Implemented
MI0440 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,242 $860 Implemented
MI0440 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,491 $1,720 Implemented
MI0440 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,986 $1,980 Implemented
MI0440 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,169 $1,320 Implemented
MI0440 # 05 Y:2024 05 2024 AIR CONDITION ONLY SPACE NECESSARY $18,769 $74,097 Implemented
MI0440 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $8,533 $42,540 Implemented
MI0440 # 09 Y:2024 09 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,423 $279 Implemented
UF0610 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $4,345 $2,330 Implemented
UF0610 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $28,883 $18,333 Implemented
UF0610 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,012 $25,400 Implemented
UF0610 # 06 Y:2024 06 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,691 $5,108 Implemented
UF0610 # 09 Y:2024 09 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $54,895 $0 Implemented
UF0610 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,899 $322,608 Implemented
UF0610 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $1,315 $4,000 Implemented
UF0610 # 11 Y:2024 11 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $4,482 $3,330 Implemented
UF0609 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,174 $25,504 Implemented
UF0609 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,360 $25,380 Implemented
UF0609 # 06 Y:2024 06 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $35,940 $0 Implemented
UF0609 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $3,546 $9,000 Implemented
UF0609 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,116 $322,608 Implemented