IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,052

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0147 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,977 $2,160 Implemented
ND0147 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,829 $300 Implemented
UD0395 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,516 $1,200 Implemented
UD0395 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,051 $8,096 Implemented
UD0395 # 03 Y:1993 03 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,731 $0 Implemented
UD0395 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,563 $10,625 Implemented
UD0395 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,009 $2,080 Implemented
WI0195 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $21,307 $17,400 Implemented
WI0195 # 07 Y:1993 07 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $671 $0 Implemented
SD0070 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,419 $200 Implemented
GT0515 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,820 $80,090 Implemented
SD0070 # 06 Y:1993 06 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $7,258 $7,590 Implemented
GT0515 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $500 Implemented
SD0070 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $1,041 Implemented
SD0070 # 04 Y:1993 04 1993 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,505 $15,000 Implemented
SD0070 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,052 $735 Implemented
SD0070 # 07 Y:1993 07 1993 INSTALL SET-BACK TIMERS $1,719 $3,360 Implemented
SD0070 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,339 $8,744 Implemented
SD0070 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,910 $3,450 Implemented
AR0015 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,562 $1,000 Implemented
UD0420 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $25,572 $16,000 Implemented
UD0420 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,897 $3,000 Implemented
UD0420 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,456 Implemented
GT0514 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,010 $7,520 Implemented
GT0514 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,450 $900 Implemented