Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,627
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0244 # 02 Y:2017 | 02 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,898 | $46,100 | Implemented |
MZ0244 # 07 Y:2017 | 07 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,749 | $17,550 | Implemented |
MZ0244 # 05 Y:2017 | 05 | 2017 | USE COMPRESSOR AIR FILTERS | $2,071 | $900 | Implemented |
MZ0244 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $150 | $280 | Implemented |
MZ0244 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,568 | $2,900 | Implemented |
MZ0244 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,566 | $0 | Implemented |
MZ0244 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,371 | $0 | Implemented |
UF0514 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,154 | $30,844 | Implemented |
UF0514 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,847 | $20,000 | Implemented |
UF0514 # 04 Y:2017 | 04 | 2017 | REDUCE EXCESS STEAM BLEEDING | $4,320 | $0 | Implemented |
UF0514 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,740 | $2,882 | Implemented |
UF0514 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,693 | $6,775 | Implemented |
UF0514 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,432 | $0 | Implemented |
UA0187 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,032 | $136,663 | Implemented |
UA0187 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,219 | $6,260 | Implemented |
UA0187 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $88,008 | $0 | Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
LS0007 # 03 Y:2017 | 03 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,729 | $0 | Implemented |
LS0007 # 01 Y:2017 | 01 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $883 | $0 | Implemented |
AS0448 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,828 | $11,700 | Implemented |
AS0448 # 02 Y:2017 | 02 | 2017 | AIR CONDITION ONLY SPACE NECESSARY | $3,949 | $0 | Implemented |
UK1714 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,475 | $5,000 | Implemented |
UK1714 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,460 | $0 | Implemented |