IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,938

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0192 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,993 $1,000 Implemented
MS0192 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,056 $50 Implemented
MS0192 # 05 Y:2001 05 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,153 $3,127 Implemented
UU0017 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $694 $700 Implemented
UU0017 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $220 Implemented
MA0500 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $14,725 $35,000 Implemented
MA0500 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,264 $2,000 Implemented
SU0108 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $780 $81 Implemented
SU0108 # 07 Y:2001 07 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,590 $7,000 Implemented
TA0020 # 02 Y:2001 02 2001 $4,751 $0 Implemented
TA0020 # 03 Y:2001 03 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,260 $240 Implemented
TA0020 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,415 $1,715 Implemented
TA0020 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,110 $321 Implemented
TA0020 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $685 $140 Implemented
TA0020 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $584 $320 Implemented
TA0020 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $370 $160 Implemented
AM0404 # 01 Y:2001 01 2001 $198,000 $25,000 Implemented
AM0404 # 02 Y:2001 02 2001 REUSE RAGS UNTIL COMPLETELY SOILED $12,600 $0 Implemented
AM0404 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,330 $41,800 Implemented
AM0404 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,800 $2,828 Implemented
AM0404 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $368 Implemented
AM0404 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $250 $0 Implemented
AM0404 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $765 Implemented
LL0124 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $537,467 $121,200 Implemented
LL0124 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126,949 $31,740 Implemented