IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,627

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1703 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,383 $20,450 Implemented
CL1703 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,843 $0 Implemented
CL1703 # 04 Y:2017 04 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,100 $2,000 Implemented
UK1708 # 07 Y:2017 07 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $217 $0 Implemented
LE0444 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $31,107 $30 Implemented
LE0444 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $917 $30 Implemented
LE0444 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $110,990 $170,000 Implemented
LE0444 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,762 $46,000 Implemented
LE0444 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,628 $5,580 Implemented
LE0444 # 10 Y:2017 10 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,541 $6,960 Implemented
LE0444 # 11 Y:2017 11 2017 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $233,480 $1,905,000 Implemented
NC0603 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,643 $50,038 Implemented
NC0603 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $40 $100 Implemented
NC0603 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,607 $500 Implemented
NC0603 # 06 Y:2017 06 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,836 $50 Implemented
NC0603 # 08 Y:2017 08 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $19,341 $30,000 Implemented
AS0446 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,695 $180 Implemented
MA0784 # 01 Y:2017 01 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $64,908 $71,450 Implemented
MA0784 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,530 $41,013 Implemented
MA0784 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,498 $18,391 Implemented
MI0323 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,478 $51,292 Implemented
MI0323 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $49,900 Implemented
MI0323 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $8,856 $2,800 Implemented
MI0323 # 06 Y:2017 06 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,290 $7,150 Implemented
MI0323 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,380 $1,660 Implemented