IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

453

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1080 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,018 $924 Implemented
UD1080 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,541 $11,151 Implemented
UF0610 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,899 $322,608 Implemented
UF0610 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $28,883 $18,333 Implemented
UF0610 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,012 $25,400 Implemented
UF0610 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $4,345 $2,330 Implemented
UF0610 # 06 Y:2024 06 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,691 $5,108 Implemented
UF0610 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $1,315 $4,000 Implemented
UF0610 # 09 Y:2024 09 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $54,895 $0 Implemented
UF0610 # 11 Y:2024 11 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $4,482 $3,330 Implemented
WV0657 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,019 $3,647 Implemented
WV0657 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,482 $1,500 Implemented
WV0657 # 06 Y:2024 06 2024 INSULATE BARE EQUIPMENT $2,493 $1,302 Implemented
WV0657 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,266 $1,107 Implemented
WV0657 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,181 $1,063 Implemented
WV0657 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $1,429 $6,850 Implemented
WV0657 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $486 $242 Implemented
IP0189 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43,723 $84,496 Implemented
IP0189 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,248 $716 Implemented
IP0189 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,852 $325 Implemented
IP0189 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,822 $0 Implemented
IP0189 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $33 Implemented
SD0652 # 13 Y:2024 13 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,703 $2,400 Implemented
SD0652 # 12 Y:2024 12 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,888 $11,237 Implemented
SD0652 # 11 Y:2024 11 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,089 $2,000 Implemented