Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,541
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0612 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,994 | $20,000 | n/a |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | n/a |
UF0612 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $13,749 | $3,750 | n/a |
UF0612 # 08 Y:2024 | 08 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,481 | $5,900 | n/a |
UF0612 # 07 Y:2024 | 07 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,443 | $21,120 | n/a |
UF0612 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $402,389 | $1,529,500 | n/a |
UF0612 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,236 | $6,087 | n/a |
UF0612 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,068 | $30,945 | n/a |
UF0612 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,735 | $34,020 | n/a |
UF0612 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,865 | $8,523 | n/a |
UF0610 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,062 | $7,200 | n/a |
UF0610 # 06 Y:2024 | 06 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,691 | $5,108 | n/a |
UF0610 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,899 | $322,608 | n/a |
UF0610 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,315 | $4,000 | n/a |
UF0610 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $28,883 | $18,333 | n/a |
UF0610 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,012 | $25,400 | n/a |
UF0610 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,119 | $36,000 | n/a |
UF0610 # 11 Y:2024 | 11 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,482 | $3,330 | n/a |
UF0610 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $15,675 | $25,000 | n/a |
UF0610 # 09 Y:2024 | 09 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $54,895 | $0 | n/a |
UF0610 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $4,345 | $2,330 | n/a |
MI0438 # 08 Y:2024 | 08 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,139 | $40 | n/a |
MI0438 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,979 | $1,660 | n/a |
MI0438 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $116,907 | $0 | n/a |
MI0438 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $26,088 | $956 | n/a |