IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2412 # 03 Y:2024 03 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,358 $0 n/a
UC2412 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $16,427 $124,645 n/a
UC2412 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,533 $75 n/a
UC2412 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,217 $900 n/a
UC2412 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $680 $0 n/a
UC2412 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $247 $0 n/a
UC2412 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $225 n/a
UC2412 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,630 $1,300 n/a
UC2411 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $962 $0 n/a
UC2411 # 06 Y:2024 06 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,203 $1,779 n/a
UC2411 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $75 n/a
UC2411 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $572 $2,608 n/a
UC2411 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $78 $100 n/a
UC2411 # 07 Y:2024 07 2024 INSTALL TIMERS AND/OR THERMOSTATS $819 $3,620 n/a
UC2411 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $23,268 $223,076 n/a
MA0835 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,773 $7,150 Implemented
MA0835 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,360 $625 Not Implemented
MA0835 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,572 $40,722 Implemented
MA0835 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $680 $750 Implemented
MA0835 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $18,072 $14,280 Not Implemented
MA0836 # 07 Y:2022 07 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,777 $7,150 Implemented
MA0836 # 06 Y:2022 06 2022 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,372 $500 Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,115 $39,510 Not Implemented
MA0836 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,531 $1,500 Implemented