Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,733
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0378 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $196,374 | $1,560,000 | n/a |
MZ0378 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $750 | n/a |
MZ0378 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26,585 | $49,000 | n/a |
MZ0378 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,844 | $12,060 | n/a |
MZ0378 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $4,373 | $750 | n/a |
MZ0378 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,972 | $3,500 | n/a |
MZ0376 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,296 | $7,200 | n/a |
MZ0376 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,889 | $18,327 | n/a |
MZ0376 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,548 | $54,000 | n/a |
MZ0376 # 06 Y:2025 | 06 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,289 | $14,380 | n/a |
MZ0376 # 02 Y:2025 | 02 | 2025 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $916 | $365 | n/a |
MZ0376 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $86,491 | $702,000 | n/a |
MZ0376 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $4,145 | $1,560 | n/a |
MZ0376 # 08 Y:2025 | 08 | 2025 | REDUCE VENTILATION AIR | $3,456 | $6,974 | n/a |
MZ0377 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $31,698 | $9,040 | n/a |
MZ0377 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $200 | n/a |
MZ0377 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $871 | $0 | n/a |
MZ0377 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $498 | $415 | n/a |
MZ0377 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,503 | $3,660 | n/a |
MZ0377 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,928 | $9,400 | n/a |
MZ0377 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,142 | $43,500 | n/a |
MZ0377 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,340 | $2,300 | n/a |
MZ0375 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,435 | $12,750 | n/a |
MZ0375 # 01 Y:2025 | 01 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,447 | $22,100 | n/a |
MZ0375 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,208 | $400 | n/a |