IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0651 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,142 $2,300 n/a
OK0651 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,926 $1,360 n/a
OK0651 # 09 Y:2002 09 2002 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $23,400 $80,000 n/a
OK0651 # 10 Y:2002 10 2002 IMPROVE SPACE COMFORT CONDITIONING $46,800 $2,500 n/a
OK0650 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $1,203 $1,190 Implemented
OK0651 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $10,697 $1,416 n/a
OK0650 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,073 $100 Implemented
OK0651 # 07 Y:2002 07 2002 IMPROVE SPACE COMFORT CONDITIONING $37,907 $36,300 n/a
OK0651 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $131,274 $26,000 n/a
OK0651 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,700 $1,350 n/a
OK0650 # 04 Y:2002 04 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $133,632 $206,750 Not Implemented
OK0650 # 03 Y:2002 03 2002 USE OPTIMUM THICKNESS INSULATION $56,715 $16,956 n/a
OK0650 # 05 Y:2002 05 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $4,021,800 $30,000,000 Not Implemented
OK0651 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $741 $975 n/a
OK0651 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,419 $20,491 n/a
OK0650 # 06 Y:2002 06 2002 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $1,550,000 $150,000 Not Implemented
OK0648 # 05 Y:2002 05 2002 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $6,955 $22,000 Not Implemented
OK0648 # 10 Y:2002 10 2002 COVER OPEN TANKS $1,983 $752 Not Implemented
OK0648 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,683 $240 Implemented
OK0648 # 01 Y:2002 01 2002 USE OPTIMUM THICKNESS INSULATION $12,108 $2,317 Implemented
OK0648 # 09 Y:2002 09 2002 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $169,242 $37,910 n/a
OK0648 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,975 $4,500 Implemented
OK0648 # 06 Y:2002 06 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $59,232 $12,200 n/a
OK0648 # 02 Y:2002 02 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $38,422 $70,536 Not Implemented
OK0648 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $94 $288 Not Implemented