Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0584 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,377 | $2,400 | n/a |
LE0584 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,504 | $600 | n/a |
LE0584 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,871 | $0 | n/a |
LE0584 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,030 | $100 | n/a |
LE0584 # 05 Y:2025 | 05 | 2025 | INSTALL BACK-UP EQUIPMENT | $148,846 | $350,000 | n/a |
LE0584 # 08 Y:2025 | 08 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,045 | $30,000 | n/a |
LE0584 # 06 Y:2025 | 06 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,853 | $5,000 | n/a |
LE0584 # 07 Y:2025 | 07 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,000 | $31,500 | n/a |
WV0671 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,306 | $17,145 | n/a |
WV0671 # 11 Y:2024 | 11 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,525 | $7,504 | n/a |
WV0671 # 10 Y:2024 | 10 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,918 | $2,094 | n/a |
WV0671 # 14 Y:2024 | 14 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $314 | $1,322 | n/a |
WV0671 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $16,714 | $10,679 | n/a |
WV0671 # 08 Y:2024 | 08 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,623 | $1,200 | n/a |
WV0671 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $3,901 | $6,364 | n/a |
WV0671 # 13 Y:2024 | 13 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $768 | $176 | n/a |
WV0671 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,906 | $5,200 | n/a |
WV0671 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $3,020 | $1,180 | n/a |
WV0671 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,594 | $38,917 | n/a |
WV0671 # 06 Y:2024 | 06 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,058 | $5,330 | n/a |
WV0671 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $799 | $1,648 | n/a |
WV0671 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,904 | $15,193 | n/a |
DL0243 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,211 | $64,000 | n/a |
DL0243 # 03 Y:2024 | 03 | 2024 | ELIMINATE/REDUCE AN OPERATION | $2,346 | $520 | n/a |
DL0243 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,139 | $51,000 | n/a |