Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0336 # 05 Y:2002 | 05 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,343 | $14,000 | Not Implemented |
AS0336 # 06 Y:2002 | 06 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $9,360 | $40 | Implemented |
AS0336 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $62,280 | $2,200 | Not Implemented |
AS0336 # 08 Y:2002 | 08 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $72,604 | $3,840 | Implemented |
AS0336 # 09 Y:2002 | 09 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,820 | $2,080 | Implemented |
OR0423 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $518,000 | $300,000 | Not Implemented |
OR0423 # 02 Y:2002 | 02 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $489,000 | $410,000 | n/a |
OR0423 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $183,000 | $120,860 | Not Implemented |
OR0423 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,800 | $20,700 | Implemented |
OR0423 # 05 Y:2002 | 05 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,900 | $0 | Implemented |
OR0423 # 06 Y:2002 | 06 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $279,200 | $2,000,000 | Not Implemented |
CO0516 # 01 Y:2002 | 01 | 2002 | INSTALL WIND POWERED ELECTRIC GENERATOR | $616,200 | $4,800,000 | Not Implemented |
CO0516 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,030 | $21,080 | Implemented |
CO0516 # 03 Y:2002 | 03 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $44,200 | $30,000 | n/a |
CO0516 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,300 | $38,900 | Not Implemented |
CO0516 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,370 | $2,480 | Implemented |
CO0516 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $900 | Implemented |
CO0515 # 01 Y:2002 | 01 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $167,740 | $45,000 | Implemented |
CO0515 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $66,100 | $24,160 | Implemented |
CO0515 # 03 Y:2002 | 03 | 2002 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $50,000 | $26,000 | Implemented |
CO0515 # 04 Y:2002 | 04 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $50,200 | $4,800 | Implemented |
CO0515 # 05 Y:2002 | 05 | 2002 | BURN WASTE OIL FOR HEAT | $34,520 | $18,000 | Not Implemented |
CO0515 # 06 Y:2002 | 06 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $241,800 | $105,900 | Not Implemented |
CO0515 # 07 Y:2002 | 07 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $187,930 | $102,500 | Not Implemented |
CO0515 # 08 Y:2002 | 08 | 2002 | INSTALL WIND POWERED ELECTRIC GENERATOR | $6,313,200 | $48,000,000 | Not Implemented |