IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0651 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,874 $52,766 Not Implemented
GT0651 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,505 $3,933 Not Implemented
GT0651 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,004 $413 Not Implemented
GT0651 # 06 Y:1998 06 1998 RECOVER AND REUSE WASTE MATERIAL $16,208 $38,860 Not Implemented
GT0651 # 07 Y:1998 07 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,099 $0 Not Implemented
GT0651 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $105,300 $120,000 Not Implemented
AR0154 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $99 $207 Implemented
AR0154 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $49,699 $135,000 Implemented
AR0154 # 03 Y:1998 03 1998 RECOVER AND REUSE COOLING WATER $4,517 $6,800 Implemented
AR0154 # 04 Y:1998 04 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $210,246 $35,000 Not Implemented
AR0154 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $52,562 $0 Implemented
AM0334 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $18,200 $22,300 Implemented
AM0334 # 02 Y:1998 02 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,680 $40,600 Not Implemented
AM0334 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
AM0334 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,000 $0 Not Implemented
AM0334 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $1,000 Implemented
AM0334 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,070 $35 Implemented
AM0334 # 07 Y:1998 07 1998 CONVERT TO AQUEOUS CLEANING SYSTEM $1,260 $1,030 Implemented
AM0334 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165 $340 Not Implemented
AM0334 # 09 Y:1998 09 1998 USE A RAG RECYCLE SERVICE $310 $0 Implemented
AM0334 # 10 Y:1998 10 1998 PAY BILLS ON TIME TO AVOID LATE FEES $300 $0 Implemented
AM0334 # 11 Y:1998 11 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $220 $0 Implemented
OR0331 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,374,400 $105,000 Implemented
OR0331 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,781 $1,000 Implemented
OR0331 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $78,861 $26,602 Not Implemented