IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0265 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,480 $2,430 Not Implemented
MS0265 # 04 Y:2004 04 2004 BURN WASTE OIL FOR HEAT $3,362 $3,129 Not Implemented
MS0265 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $189 Implemented
MS0265 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $791 $472 Not Implemented
MS0265 # 07 Y:2004 07 2004 SHUT OFF PILOTS IN STANDBY EQUIPMENT $774 $176 Not Implemented
IA0358 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,532 $1,000 Implemented
IA0358 # 02 Y:2004 02 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,969 $18,000 Implemented
IA0358 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,577 $1,000 Implemented
IA0358 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,528 $359 Implemented
IA0358 # 05 Y:2004 05 2004 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $3,523 $1,800 Not Implemented
IA0358 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,052 $609 Not Implemented
IA0358 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $633 $633 Implemented
IA0358 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,955 $3,368 Implemented
IA0358 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $2,030 Not Implemented
IA0358 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $414 $924 Not Implemented
IA0358 # 11 Y:2004 11 2004 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,223 $100 Implemented
IA0358 # 12 Y:2004 12 2004 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $3,166 $40 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
MS0264 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,457 $480 Not Implemented
MS0264 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,356 $1,624 Not Implemented
MS0264 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $989 $944 Not Implemented
MS0264 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $183 $249 Not Implemented
UU0075 # 01 Y:2004 01 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $400 $250 Not Implemented
UU0075 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,590 $1,320 Implemented