IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0165 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $293 $54 Implemented
MS0165 # 04 Y:2000 04 2000 ELIMINATE/REDUCE AN OPERATION $1,457 $0 Implemented
NC0186 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,878 $20 Not Implemented
NC0186 # 02 Y:2000 02 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,993 $6,400 Not Implemented
NC0186 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $9,327 $32,175 Not Implemented
NC0186 # 04 Y:2000 04 2000 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,321 $4,000 Implemented
NC0186 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,150 $200 Not Implemented
NC0191 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,005 $1,000 Implemented
NC0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,096 $1,753 Implemented
NC0191 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $545 $1,050 Implemented
NC0191 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $593 $0 Not Implemented
NC0191 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $0 Implemented
NC0191 # 06 Y:2000 06 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $29,945 $40,000 Implemented
NC0191 # 07 Y:2000 07 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,556 $1,000 Implemented
NC0191 # 08 Y:2000 08 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $6,729 $288 Not Implemented
OK0599 # 01 Y:2000 01 2000 COMBINE UTILITY METERS $15,427 $10,600 Not Implemented
OK0599 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $777 $3,841 Not Implemented
OK0599 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,866 $1,300 Not Implemented
OK0599 # 04 Y:2000 04 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,139 $12,800 Not Implemented
OK0599 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $89,040 $0 Not Implemented
OK0599 # 06 Y:2000 06 2000 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $200,000 $300,000 Not Implemented
OK0599 # 07 Y:2000 07 2000 PURCHASE APPROPRIATELY SIZED MATERIAL $224,052 $150 Not Implemented
SD0255 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $124,864 $87,000 Not Implemented
SD0255 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,967 $40,000 Implemented
SD0255 # 03 Y:2000 03 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,615 $7,500 Implemented