IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,315

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0115 # 07 Y:1995 07 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $367 $194 Not Implemented
IA0115 # 08 Y:1995 08 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $25 Implemented
IA0115 # 09 Y:1995 09 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $114 $105 Not Implemented
IA0113 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $1,000 Implemented
IA0113 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,014 $684 Implemented
IA0113 # 03 Y:1995 03 1995 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $111 $193 Not Implemented
IA0113 # 04 Y:1995 04 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,348 $0 Not Implemented
IA0113 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $806 $1,370 Implemented
IA0113 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,078 $13,034 Implemented
IA0113 # 07 Y:1995 07 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,243 $75 Not Implemented
IA0113 # 08 Y:1995 08 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,818 $5,467 Implemented
IA0113 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,184 $3,600 Not Implemented
IA0112 # 01 Y:1995 01 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $38,404 $325 Implemented
IA0112 # 02 Y:1995 02 1995 COVER OPEN TANKS $12,802 $5,018 Not Implemented
IA0112 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $50 Implemented
IA0112 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,062 $9,608 Implemented
IA0112 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $951 Implemented
IA0112 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,463 $500 Implemented
IA0112 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,119 $325 Implemented
IA0112 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,454 $3,000 Not Implemented
IA0111 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,199 $58,658 Not Implemented
IA0111 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,310 $3,860 Not Implemented
IA0111 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,777 $9,655 Implemented
IA0111 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $1,159 $1,609 Not Implemented
IA0111 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,029 $500 Implemented