IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0646 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $5,088 Not Implemented
UD0646 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $61 Not Implemented
UD0646 # 08 Y:2002 08 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,092 $0 Not Implemented
UD0646 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $613 $1,431 Not Implemented
UD0646 # 10 Y:2002 10 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $379 $499 Implemented
UD0646 # 11 Y:2002 11 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $311 $640 Not Implemented
AM0419 # 01 Y:2002 01 2002 $180,000 $700,000 Not Implemented
AM0419 # 02 Y:2002 02 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,460 $1,470 Implemented
AM0419 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,250 $2,000 Implemented
AM0419 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,140 $1,140 Implemented
AM0419 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $3,970 $3,000 Not Implemented
AM0419 # 06 Y:2002 06 2002 USE SYNTHETIC LUBRICANT $3,415 $0 Not Implemented
AM0419 # 07 Y:2002 07 2002 USE PHOTOCELL CONTROLS $555 $200 Implemented
AM0419 # 08 Y:2002 08 2002 CHECK FOR ACCURACY OF UTILITY / POWER METERS $490 $0 Implemented
AM0419 # 09 Y:2002 09 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $475 $0 Not Implemented
AM0419 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $406 $540 Implemented
LM0037 # 01 Y:2002 01 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,266 $1,050 Not Implemented
LM0037 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,665 $2,150 Not Implemented
LM0037 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,259 $1,700 Implemented
LM0037 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,595 $27,000 Not Implemented
LM0037 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $1,908 $306 Not Implemented
LM0037 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $755 $224 Not Implemented
LM0037 # 07 Y:2002 07 2002 $45,000 $40,000 Not Implemented
LM0037 # 08 Y:2002 08 2002 $17,066 $14,227 Not Implemented
BD0212 # 01 Y:2002 01 2002 REPLACE BOILER $17,844 $70,000 Implemented