IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0269 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,374 $23,821 Implemented
WV0269 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,081 $230 Not Implemented
WV0269 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $3,716 $350 Implemented
WV0269 # 09 Y:2003 09 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,656 $690 Implemented
WV0269 # 10 Y:2003 10 2003 RECOVER WASTE HEAT FROM EQUIPMENT $36,459 $6,156 Not Implemented
MA0534 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $223,213 $1,257,060 Not Implemented
MA0534 # 02 Y:2003 02 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $76,320 $57,480 Not Implemented
MA0534 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,487 $53,950 Not Implemented
MA0534 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,457 $67,665 Not Implemented
MA0534 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $19,634 $12,975 Not Implemented
MA0534 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,591 $8,425 Not Implemented
MA0534 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,624 $21,000 Not Implemented
MA0534 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,663 $9,742 Not Implemented
MA0534 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $1,416 Not Implemented
MS0228 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,861 $6,210 Not Implemented
MS0228 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $276 Implemented
MS0228 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,499 $2,540 Implemented
MS0228 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,237 $1,210 Not Implemented
MS0228 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $323 $0 Implemented
MS0228 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $90 $157 Not Implemented
BD0236 # 01 Y:2003 01 2003 USE RADIANT HEATER FOR SPOT HEATING $20,989 $23,000 Not Implemented
BD0236 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,247 $900 Implemented
BD0236 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,511 $19,250 Implemented
BD0236 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,728 $200 Implemented
BD0236 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $3,143 $2,325 Implemented