Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0269 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,374 | $23,821 | Implemented |
WV0269 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,081 | $230 | Not Implemented |
WV0269 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $3,716 | $350 | Implemented |
WV0269 # 09 Y:2003 | 09 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $19,656 | $690 | Implemented |
WV0269 # 10 Y:2003 | 10 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,459 | $6,156 | Not Implemented |
MA0534 # 01 Y:2003 | 01 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $223,213 | $1,257,060 | Not Implemented |
MA0534 # 02 Y:2003 | 02 | 2003 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $76,320 | $57,480 | Not Implemented |
MA0534 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,487 | $53,950 | Not Implemented |
MA0534 # 04 Y:2003 | 04 | 2003 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $20,457 | $67,665 | Not Implemented |
MA0534 # 05 Y:2003 | 05 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $19,634 | $12,975 | Not Implemented |
MA0534 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,591 | $8,425 | Not Implemented |
MA0534 # 07 Y:2003 | 07 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,624 | $21,000 | Not Implemented |
MA0534 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,663 | $9,742 | Not Implemented |
MA0534 # 09 Y:2003 | 09 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $470 | $1,416 | Not Implemented |
MS0228 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,861 | $6,210 | Not Implemented |
MS0228 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,344 | $276 | Implemented |
MS0228 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,499 | $2,540 | Implemented |
MS0228 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,237 | $1,210 | Not Implemented |
MS0228 # 05 Y:2003 | 05 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $323 | $0 | Implemented |
MS0228 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $90 | $157 | Not Implemented |
BD0236 # 01 Y:2003 | 01 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $20,989 | $23,000 | Not Implemented |
BD0236 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,247 | $900 | Implemented |
BD0236 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,511 | $19,250 | Implemented |
BD0236 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,728 | $200 | Implemented |
BD0236 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $3,143 | $2,325 | Implemented |