IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0174 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,401 $1,048 Implemented
IP0174 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,877 $14,812 Implemented
IP0174 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,006 $2,730 Implemented
IP0174 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,518 $123,235 Implemented
IP0174 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,594 $78,000 Not Implemented
UF0597 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,876 $14,705 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented
UF0597 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,142 $22,000 Implemented
UF0597 # 05 Y:2023 05 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,959 $11,134 Implemented
UF0597 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $13,706 Implemented
UF0597 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,699 $4,994 Implemented
UF0597 # 08 Y:2023 08 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $51,744 $18,218 Implemented
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
UL2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,408 $2,832 Implemented
UL2301 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $5,141 $9,184 Not Implemented
UL2301 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $33,531 $260,163 Not Implemented
UL2301 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,944 $0 Not Implemented
UL2301 # 05 Y:2023 05 2023 ADOPT IN-HOUSE MATERIAL GENERATION $85,200 $50,198 Not Implemented
SD0639 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $55,294 $90,412 Implemented
SD0639 # 02 Y:2023 02 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $15,758 $0 Implemented
SD0639 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,572 $31,410 Implemented
SD0639 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,271 $4,317 Implemented
SD0639 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,109 $18,901 Implemented
SD0639 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,370 $18,675 Implemented