Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,821
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2304 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,246 | $1,300 | Implemented |
UL2304 # 06 Y:2023 | 06 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $84,650 | $36,445 | Not Implemented |
UL2304 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,731 | $40,000 | Not Implemented |
SJ0005 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,218 | $962 | Implemented |
SJ0005 # 02 Y:2023 | 02 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $23,445 | $5,613 | Not Implemented |
SJ0005 # 03 Y:2023 | 03 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $270 | $0 | Not Implemented |
SJ0005 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,251 | $4,556 | Not Implemented |
SJ0005 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $854 | $658 | Not Implemented |
SJ0005 # 06 Y:2023 | 06 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $5,992 | $2,536 | Implemented |
UD1059 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $43,663 | $1,000 | Implemented |
UD1059 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,386 | $1,200 | Implemented |
UD1059 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,947 | $14,000 | Implemented |
UD1059 # 04 Y:2023 | 04 | 2023 | DISCONNECT BALLASTS | $776 | $3,500 | Not Implemented |
UD1059 # 05 Y:2023 | 05 | 2023 | UPGRADE CONVEYORS | $150,522 | $270,472 | Not Implemented |
UD1059 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,047 | $800 | Implemented |
UD1059 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $403 | $0 | Not Implemented |
AM0885 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,122 | $2,000 | n/a |
AM0885 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,090 | $840,312 | n/a |
AM0885 # 03 Y:2023 | 03 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,486 | $2,000 | n/a |
KS2319 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,385 | $5,960 | n/a |
KS2319 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $593 | $60 | n/a |
KS2319 # 03 Y:2023 | 03 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,009 | $5,440 | n/a |
KS2319 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $307 | $119 | n/a |
KS2319 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,663 | $19,796 | n/a |
KS2319 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,311 | $1,196,880 | n/a |