IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0333 # 04 Y:2007 04 2007 USE RADIANT HEATER FOR SPOT HEATING $73,372 $30,001 Not Implemented
BD0333 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $67,989 $35,001 Not Implemented
BD0333 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $526 Implemented
BD0333 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $2 Implemented
BD0333 # 08 Y:2007 08 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $66,946 $2 Not Implemented
BD0332 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $20,588 $1,951 Not Implemented
BD0332 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $608 $1,401 Not Implemented
BD0332 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $476 Not Implemented
BD0332 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $2 Not Implemented
BD0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $496 $351 Not Implemented
BD0332 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $23,837 $40,001 Not Implemented
BD0332 # 07 Y:2007 07 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,182 $2 Not Implemented
BD0331 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,434 $19,814 Not Implemented
BD0331 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $4,359 $2,026 Not Implemented
BD0331 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $524 $65 Not Implemented
BD0331 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,450 $4,951 Implemented
BD0331 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,820 $301 Not Implemented
BD0331 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $321 $2 Not Implemented
BD0331 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $841 $2 Not Implemented
BD0331 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,672 $7,701 Not Implemented
BD0331 # 09 Y:2007 09 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,486 $26,401 Not Implemented
BD0331 # 10 Y:2007 10 2007 $9,311 $301 Not Implemented
BD0331 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $53,878 $20,001 Not Implemented
IC0131 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,220 $65,800 Implemented
IC0131 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,150 $105,762 Implemented