IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0590 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,604 $5,081 Not Implemented
OK0590 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,743 $1,613 Implemented
OK0590 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $761 $1,440 Not Implemented
OK0589 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,862 $1,900 Implemented
OK0589 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,093 $4,942 Implemented
OK0589 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $504 $136 Implemented
OK0589 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,000 $230,000 Implemented
OK0589 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $20,274 $59,400 Implemented
OK0588 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,131 $24,500 Not Implemented
OK0588 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $757 $800 Not Implemented
OK0588 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,673 $3,000 Not Implemented
OK0588 # 04 Y:2000 04 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $525 $60 Not Implemented
OK0588 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,662 $6,960 Not Implemented
OK0588 # 06 Y:2000 06 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,400 $65,450 Not Implemented
OK0588 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $18,000 $0 Not Implemented
OK0588 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $24,375 $65,000 Not Implemented
OK0580 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,082 $98,500 Not Implemented
OK0580 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $24,960 $80,000 Not Implemented
OK0580 # 03 Y:1999 03 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,280 $140,000 Not Implemented
OK0580 # 04 Y:1999 04 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $840 $0 Implemented
OK0580 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $611 $0 Implemented
OK0587 # 01 Y:1999 01 1999 INSTALL SYSTEM TO COLLECT SCRAP $20,078 $2,250 n/a
OK0587 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,905 $0 n/a
OK0587 # 03 Y:1999 03 1999 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,398 $31,705 n/a
OK0587 # 04 Y:1999 04 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,795 $0 n/a