Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0339 # 03 Y:1991 | 03 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,840 | $0 | Implemented |
OK0339 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $496 | $441 | Implemented |
UD0338 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,351 | $0 | Not Implemented |
UD0338 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,344 | $0 | Not Implemented |
UD0338 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,748 | $0 | Not Implemented |
UD0339 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,489 | $0 | Implemented |
UD0339 # 02 Y:1991 | 02 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,089 | $0 | Implemented |
UD0339 # 03 Y:1991 | 03 | 1991 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $678 | $5,000 | Implemented |
UD0340 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $5,952 | $2,000 | Implemented |
UD0340 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,513 | $0 | Implemented |
UD0340 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,840 | $5,000 | Implemented |
KU0335 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,716 | $0 | Implemented |
KU0335 # 02 Y:1991 | 02 | 1991 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $6,430 | $0 | Implemented |
KU0335 # 03 Y:1991 | 03 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,755 | $1,500 | Implemented |
KU0335 # 04 Y:1991 | 04 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,018 | $0 | Implemented |
KU0335 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $641 | $300 | Implemented |
KU0335 # 06 Y:1991 | 06 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $590 | $0 | Implemented |
KU0335 # 07 Y:1991 | 07 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $369 | $300 | Implemented |
KU0335 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $408 | $388 | Implemented |
KU0336 # 01 Y:1991 | 01 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,491 | $19,500 | Implemented |
KU0336 # 02 Y:1991 | 02 | 1991 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $15,055 | $18,000 | Implemented |
KU0336 # 03 Y:1991 | 03 | 1991 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,114 | $27,600 | Implemented |
KU0336 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,818 | $3,800 | Implemented |
KU0336 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,099 | $22,000 | Implemented |
KU0336 # 06 Y:1991 | 06 | 1991 | REDESIGN PROCESS | $10,585 | $25,200 | Implemented |