IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0217 # 08 Y:2001 08 2001 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,814 $29,000 Not Implemented
NC0217 # 09 Y:2001 09 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $27,457 $100,000 Not Implemented
WV0215 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $406 $52 Implemented
WV0215 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $93 $300 Implemented
WV0215 # 03 Y:2001 03 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,956 $1,278 Not Implemented
WV0215 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $92 $122 Not Implemented
WV0215 # 05 Y:2001 05 2001 USE OPTIMUM THICKNESS INSULATION $1,387 $585 Implemented
WV0215 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $107 $203 Not Implemented
WV0215 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $663 $150 Not Implemented
WV0215 # 08 Y:2001 08 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $97 $780 Implemented
WV0215 # 09 Y:2001 09 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,456 $100 Implemented
WV0215 # 10 Y:2001 10 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,440 $100 Implemented
WV0215 # 11 Y:2001 11 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $12,000 Not Implemented
AM0401 # 01 Y:2001 01 2001 REPAIR OR REPLACE STEAM TRAPS $147,000 $800 Implemented
AM0401 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $76,500 $0 Not Implemented
AM0401 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $46,800 $1,400 Implemented
AM0401 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,020 $119,000 n/a
AM0401 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $13,200 $28,000 n/a
AM0401 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,300 $0 Implemented
AM0401 # 07 Y:2001 07 2001 REPAIR AND ELIMINATE STEAM LEAKS $3,400 $1,000 Implemented
AM0401 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $700 Not Implemented
IA0267 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,910 $120 Implemented
IA0267 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,711 $2,000 Implemented
IA0267 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,261 $65 Not Implemented
IA0267 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,199 $0 Not Implemented