IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0216 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $1,799 $549 Implemented
NC0216 # 05 Y:2001 05 2001 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,998 $40,000 Implemented
NC0216 # 06 Y:2001 06 2001 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $50,246 $30,000 Not Implemented
NC0216 # 07 Y:2001 07 2001 $130,124 $27,500 Not Implemented
NC0217 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,205 $3,300 Not Implemented
NC0217 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,659 $6,560 Implemented
NC0217 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $6,328 $5,000 Not Implemented
NC0217 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,283 $1,180 Not Implemented
NC0217 # 05 Y:2001 05 2001 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,804 $35,000 Not Implemented
NC0217 # 06 Y:2001 06 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $11,002 $2,200 Implemented
NC0217 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,344 $2,483 Implemented
NC0217 # 08 Y:2001 08 2001 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,814 $29,000 Not Implemented
NC0217 # 09 Y:2001 09 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $27,457 $100,000 Not Implemented
IA0267 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,910 $120 Implemented
IA0267 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,711 $2,000 Implemented
IA0267 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,261 $65 Not Implemented
IA0267 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,199 $0 Not Implemented
IA0267 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,590 $4,978 Not Implemented
IA0267 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $571 $1,397 Not Implemented
IA0267 # 07 Y:2001 07 2001 $511,200 $300,000 Not Implemented
IA0267 # 08 Y:2001 08 2001 $127,800 $107,000 Not Implemented
IA0267 # 09 Y:2001 09 2001 $18,225 $42,125 Not Implemented
IA0267 # 10 Y:2001 10 2001 $10,872 $7,000 Not Implemented
AM0401 # 01 Y:2001 01 2001 REPAIR OR REPLACE STEAM TRAPS $147,000 $800 Implemented
AM0401 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $76,500 $0 Not Implemented