IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0099 # 06 Y:2005 06 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $68,594 $1,000 Not Implemented
LM0099 # 07 Y:2005 07 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $12,120 $968 Not Implemented
MI0106 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $19,885 $760 Implemented
MI0106 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,649 $12,563 Not Implemented
MI0106 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,418 $225 Implemented
MI0106 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $862 Implemented
MI0106 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,390 $56 Implemented
MI0106 # 06 Y:2005 06 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $834 $600 Not Implemented
MI0106 # 07 Y:2005 07 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $756 $1,536 Not Implemented
CO0565 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,830 $26,240 Not Implemented
CO0565 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,150 $1,210 Implemented
CO0565 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,930 $8,780 Not Implemented
CO0565 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $270 Implemented
CO0565 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,160 $4,070 Not Implemented
CO0565 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $500 Implemented
CO0565 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $500 Not Implemented
CO0565 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $130 $210 Not Implemented
BD0286 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140,820 $28,500 Implemented
BD0286 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94,025 $122,830 Implemented
BD0286 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40,515 $5,400 Not Implemented
BD0286 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,974 $14,000 Implemented
BD0286 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $9,987 $2,625 Implemented
BD0286 # 06 Y:2005 06 2005 INSTALL TURBULATORS $8,810 $12,000 Implemented
BD0286 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,152 $1,200 Implemented
BD0286 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,506 $0 Implemented