IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0428 # 03 Y:2013 03 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,262 $15,000 Implemented
BD0428 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,563 $20 Not Implemented
BD0428 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,430 $2,257 Not Implemented
BD0428 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,903 $1,400 Not Implemented
BD0428 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,310 $2,000 Implemented
BD0428 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,273 $3,150 Not Implemented
WV0470 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,095 $2,500 Implemented
WV0470 # 02 Y:2013 02 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $16,582 $68,000 Implemented
WV0470 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,807 $20,200 Not Implemented
WV0470 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,666 $1,080 Implemented
WV0470 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,422 $13,020 Not Implemented
WV0470 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,069 $2,050 Implemented
WV0470 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,736 $1,700 Implemented
WV0470 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,892 $3,300 Not Implemented
WV0470 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $105 Implemented
WV0470 # 10 Y:2013 10 2013 DEVELOP A REPAIR/REPLACE POLICY $152 $380 Not Implemented
SD0471 # 01 Y:2013 01 2013 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $629,471 $234,900 Not Implemented
SD0471 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $277,284 $353,400 Not Implemented
SD0471 # 03 Y:2013 03 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $92,696 $131,400 Not Implemented
SD0471 # 04 Y:2013 04 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $79,351 $96,000 Not Implemented
SD0471 # 05 Y:2013 05 2013 UPGRADE OBSOLETE EQUIPMENT $34,337 $110,000 Not Implemented
SD0471 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,423 $100,248 Implemented
SD0471 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,316 $500 Not Implemented
SD0471 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,126 $3,300 Implemented
SD0471 # 09 Y:2013 09 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,810 $18,500 Not Implemented