IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0281 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $2,709 Not Implemented
AS0281 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $581 $600 Not Implemented
AS0281 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,825 $3,713 Not Implemented
AS0281 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,723 $4,950 Not Implemented
AS0281 # 05 Y:2000 05 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $8,037 $8,525 Implemented
AS0281 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $456 $60 Implemented
AS0281 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,476 $60 Not Implemented
AS0281 # 08 Y:2000 08 2000 MODIFY STARTUP/SHUTDOWN TIMES $8,782 $9,600 Not Implemented
AS0281 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $31,250 $15,000 Not Implemented
AS0280 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,109 $12,163 Implemented
AS0280 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,996 $2,925 Not Implemented
AS0280 # 03 Y:2000 03 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,658 $1,605 Implemented
AS0280 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,673 $30,000 Implemented
AS0280 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,337 $1,066 Implemented
AS0280 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,719 $60 Not Implemented
AS0280 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $683 $220 Not Implemented
AS0280 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $995 $378 Implemented
AS0280 # 09 Y:2000 09 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $287 $60 Implemented
AS0280 # 10 Y:2000 10 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $444 $60 Not Implemented
AS0280 # 11 Y:2000 11 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $697 $60 Not Implemented
AS0280 # 12 Y:2000 12 2000 INSTALL SENSORS TO DETECT DEFECTS $136,234 $16,000 Not Implemented
AS0280 # 13 Y:2000 13 2000 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $212,800 $30,000 Not Implemented
CO0467 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,730 $2,000 Not Implemented
CO0467 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,280 $2,250 Not Implemented
CO0467 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $0 Implemented