IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0267 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,590 $4,978 Not Implemented
IA0267 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $571 $1,397 Not Implemented
IA0267 # 07 Y:2001 07 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $511,200 $300,000 Not Implemented
IA0267 # 08 Y:2001 08 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $127,800 $107,000 Not Implemented
IA0267 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $18,225 $42,125 Not Implemented
IA0267 # 10 Y:2001 10 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $10,872 $7,000 Not Implemented
MI0010 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,160 $1,009 Implemented
MI0010 # 02 Y:2001 02 2001 METER WASTE WATER $3,711 $3,650 Implemented
MI0010 # 03 Y:2001 03 2001 IMPROVE SPACE COMFORT CONDITIONING $47,345 $7,000 Implemented
MI0010 # 04 Y:2001 04 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $8,000 $5,000 Implemented
MI0010 # 05 Y:2001 05 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,511 $6,500 Not Implemented
AS0300 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $120 $525 Not Implemented
AS0300 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,174 $300 Implemented
AS0300 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,824 $30 Implemented
AS0300 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,272 $60 Not Implemented
AS0300 # 05 Y:2001 05 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $815,625 $640 Implemented
OK0622 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,626 $2,120 Implemented
OK0622 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,659 $1,089 Implemented
OK0622 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,700 $654 Implemented
OK0622 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,944 $100 Not Implemented
OK0622 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $2,788 $288 Not Implemented
OK0622 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,100 $152,055 Implemented
OK0622 # 07 Y:2001 07 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $635,180 $125,000 Implemented
UD0624 # 01 Y:2001 01 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $29,813 $10,710 Not Implemented
UD0624 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,975 $13,704 Implemented