IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0296 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,379 $500 Not Implemented
SD0296 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $878 $0 Implemented
SD0296 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $3,766 $616 Not Implemented
SD0296 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,500 $5,000 Not Implemented
SD0296 # 08 Y:2002 08 2002 INCREASE USE OF AUTOMATION $5,965 $3,500 Not Implemented
SD0296 # 09 Y:2002 09 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,019 $5,500 Implemented
SD0296 # 10 Y:2002 10 2002 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $2,019 $5,800 Implemented
SF0237 # 01 Y:2002 01 2002 REPAIR AND ELIMINATE STEAM LEAKS $7,124 $0 Implemented
SF0237 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,874 $0 Implemented
SF0237 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $4,283 $960 Not Implemented
SF0237 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,539 $1,024 Implemented
SF0237 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $8,315 $6,667 Implemented
SF0237 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,732 $16,065 Not Implemented
SF0237 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,405 $58,318 Implemented
SF0237 # 08 Y:2002 08 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $210 $627 Not Implemented
SF0237 # 09 Y:2002 09 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,489 $0 Implemented
SF0237 # 10 Y:2002 10 2002 OPTIMIZE PLANT POWER FACTOR $4,500 $5,806 Not Implemented
MS0207 # 01 Y:2002 01 2002 INSTALL TIMERS AND/OR THERMOSTATS $2,269 $291 Not Implemented
MS0207 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,575 $200 Implemented
MS0207 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $990 $1,000 Implemented
MS0207 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $983 $786 Not Implemented
MS0207 # 05 Y:2002 05 2002 INSTALL TIMERS AND/OR THERMOSTATS $491 $437 Not Implemented
MS0207 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $270 $44 Implemented
MS0207 # 07 Y:2002 07 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,671 $162 Not Implemented
MS0207 # 08 Y:2002 08 2002 BURN WASTE OIL FOR HEAT $4,037 $3,654 Not Implemented