IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0320 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,749 $42,038 Not Implemented
SU0320 # 04 Y:2012 04 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $391 $1,332 Not Implemented
SU0320 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,671 $37,046 Not Implemented
SU0320 # 06 Y:2012 06 2012 MAKE A NEW BY-PRODUCT $21,685 $100,000 Not Implemented
SU0320 # 07 Y:2012 07 2012 ELIMINATE/REDUCE AN OPERATION $2,644 $15,840 Not Implemented
BD0413 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,209 $12,000 Not Implemented
BD0413 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,063 $3,690 Not Implemented
BD0413 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,599 $3,696 Implemented
BD0413 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,421 $300 Not Implemented
BD0413 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,935 $2,100 Implemented
BD0413 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,398 $20 Not Implemented
BD0413 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $753 $500 Implemented
BD0413 # 08 Y:2012 08 2012 USE POWER DURING OFF-PEAK PERIODS $555 $20 Not Implemented
BD0413 # 09 Y:2012 09 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $978 $1,200 Not Implemented
UA0080 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,321 $480 Implemented
UA0080 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,884 $6,195 Not Implemented
UA0080 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $15,904 $7,093 Not Implemented
UA0080 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $981 $364 Implemented
UA0080 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,157 $1,443 Not Implemented
UA0080 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $632 $270 Implemented
UM0400 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,282 $47,885 Not Implemented
UM0400 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,755 $17,500 Not Implemented
UM0400 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,437 $4,000 Not Implemented
UM0400 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,410 $200 Not Implemented
UM0400 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,287 $5,040 Not Implemented