Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0513 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,628 | $42,560 | Not Implemented |
SD0513 # 02 Y:2015 | 02 | 2015 | COVER OPEN TANKS | $4,719 | $415 | Not Implemented |
SD0513 # 03 Y:2015 | 03 | 2015 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,873 | $200 | Not Implemented |
SD0513 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,240 | $2,500 | Not Implemented |
SD0513 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $505 | $350 | Not Implemented |
SD0513 # 06 Y:2015 | 06 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $356 | $72 | Not Implemented |
SD0512 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $3,224 | $2,850 | Implemented |
SD0512 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,985 | $5,247 | Implemented |
SD0512 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,138 | $61,820 | Not Implemented |
SD0512 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,697 | $25,608 | Implemented |
SD0512 # 03 Y:2015 | 03 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,185 | $45,900 | Implemented |
SD0512 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,532 | $800 | Implemented |
SF0469 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,953 | $0 | Not Implemented |
SF0469 # 02 Y:2015 | 02 | 2015 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $6,607 | $2,460 | Not Implemented |
SF0469 # 03 Y:2015 | 03 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $152 | $85 | Implemented |
SF0469 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,689 | $8,237 | Not Implemented |
SF0469 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $660 | $1,671 | Not Implemented |
SF0469 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,789 | $82,161 | Implemented |
SF0468 # 01 Y:2015 | 01 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $3,541 | $0 | Implemented |
SF0468 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,328 | $0 | Not Implemented |
SF0468 # 03 Y:2015 | 03 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,761 | $0 | Implemented |
SF0468 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,358 | $455 | Not Implemented |
SF0468 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,141 | $1,658 | Implemented |
SF0468 # 06 Y:2015 | 06 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,031 | $8,158 | Implemented |
SF0468 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $356 | $274 | Implemented |