IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,315

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0102 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,169 $850 Not Implemented
IA0102 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $861 $175 Implemented
IA0102 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $700 Not Implemented
IA0102 # 06 Y:1994 06 1994 INSTALL TIMERS AND/OR THERMOSTATS $689 $130 Not Implemented
IA0099 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $22,684 $0 Implemented
IA0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $11,414 $1,400 Implemented
IA0099 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,352 $500 Implemented
IA0099 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,278 $2,340 Implemented
IA0099 # 05 Y:1994 05 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,683 $0 Not Implemented
IA0099 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,924 $1,028 Not Implemented
IA0099 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $947 $693 Not Implemented
IA0099 # 08 Y:1994 08 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,201 $1,300 Not Implemented
IA0099 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $535 $0 Not Implemented
IA0098 # 01 Y:1994 01 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,348 $2,200 Not Implemented
IA0098 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,661 $700 Implemented
IA0098 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,269 $500 Not Implemented
IA0098 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,334 $100 Implemented
IA0098 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $461 $135 Not Implemented
IA0098 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $2,286 Implemented
IA0098 # 07 Y:1994 07 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $698 $260 Not Implemented
IA0097 # 01 Y:1994 01 1994 UPGRADE OBSOLETE EQUIPMENT $146,835 $367,000 Not Implemented
IA0097 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,716 $4,000 Implemented
IA0097 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,939 $355 Implemented
IA0097 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,091 $3,634 Not Implemented
IA0097 # 05 Y:1994 05 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,272 $1,686 Not Implemented