Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0165 # 04 Y:1992 | 04 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,074 | $2,250 | Implemented |
OR0165 # 05 Y:1992 | 05 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $830 | $0 | Implemented |
OR0165 # 06 Y:1992 | 06 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $320 | $824 | Implemented |
OR0164 # 01 Y:1992 | 01 | 1992 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,115 | $0 | Not Implemented |
OR0164 # 02 Y:1992 | 02 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,608 | $0 | Implemented |
OR0164 # 03 Y:1992 | 03 | 1992 | RECOVER MECHANICAL ENERGY | $929 | $0 | Implemented |
OR0164 # 04 Y:1992 | 04 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,042 | $500 | Implemented |
OR0164 # 05 Y:1992 | 05 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,127 | $4,466 | Implemented |
OR0164 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,419 | $0 | Not Implemented |
OR0163 # 01 Y:1992 | 01 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,055 | $0 | Implemented |
OR0163 # 02 Y:1992 | 02 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,832 | $360 | Implemented |
OR0163 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,260 | $4,000 | Implemented |
OR0163 # 04 Y:1992 | 04 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $676 | $1,436 | Implemented |
OR0163 # 05 Y:1992 | 05 | 1992 | RECOVER MECHANICAL ENERGY | $300 | $850 | Not Implemented |
OR0163 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349 | $0 | Implemented |
OR0162 # 01 Y:1992 | 01 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $289 | $0 | Not Implemented |
OR0162 # 02 Y:1992 | 02 | 1992 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,784 | $2,920 | Implemented |
OR0162 # 03 Y:1992 | 03 | 1992 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $524 | $750 | Implemented |
OR0162 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,666 | $5,359 | Implemented |
OR0162 # 05 Y:1992 | 05 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $4,388 | $14,272 | Not Implemented |
OR0162 # 06 Y:1992 | 06 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,207 | $150,000 | Implemented |
OR0162 # 07 Y:1992 | 07 | 1992 | REDESIGN PROCESS | $15,590 | $130,000 | Not Implemented |
OR0160 # 01 Y:1992 | 01 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $1,500 | Not Implemented |
OR0160 # 02 Y:1992 | 02 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,022,395 | $250,000 | Implemented |
OR0160 # 03 Y:1992 | 03 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $387 | $237 | Not Implemented |