IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0758 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,786 $0 Not Implemented
UD0758 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,657 $0 Implemented
UD0758 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,876 $2,500 Implemented
UD0758 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $992 $3,000 Not Implemented
UD0758 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $876 $144 Implemented
UD0758 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $538 $0 Not Implemented
UD0758 # 12 Y:2007 12 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $430 $0 Implemented
UD0758 # 13 Y:2007 13 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $200 Not Implemented
MA0613 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $22,488 $15,475 Implemented
MA0613 # 02 Y:2007 02 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,346 $54,617 Implemented
MA0613 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,574 $53,250 Implemented
MA0613 # 04 Y:2007 04 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,408 $15,900 Not Implemented
MA0613 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $507 $256 Implemented
UD0757 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,124 $0 Implemented
UD0757 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,618 $48,190 Not Implemented
UD0757 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,547 $1,600 Implemented
UD0757 # 04 Y:2007 04 2007 USE OPTIMUM TEMPERATURE $8,681 $0 Not Implemented
UD0757 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,031 $0 Implemented
UD0757 # 06 Y:2007 06 2007 USE OPTIMUM THICKNESS INSULATION $5,633 $606 Not Implemented
UD0757 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $5,019 $0 Not Implemented
UD0757 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,293 $0 Implemented
UD0757 # 09 Y:2007 09 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,300 $992 Not Implemented
NC0357 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,234 $78,000 Not Implemented
NC0357 # 02 Y:2007 02 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $16,558 $5,600 Not Implemented
NC0357 # 03 Y:2007 03 2007 DEVELOP A REPAIR/REPLACE POLICY $699 $375 Not Implemented