Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0474 # 01 Y:1992 | 01 | 1992 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,054 | $3,630 | Implemented |
TN0474 # 02 Y:1992 | 02 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,201 | $885 | Implemented |
TN0474 # 03 Y:1992 | 03 | 1992 | INSULATE BARE EQUIPMENT | $792 | $540 | Implemented |
TN0474 # 04 Y:1992 | 04 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $257 | $170 | Implemented |
TN0474 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $364 | $500 | Implemented |
TN0474 # 06 Y:1992 | 06 | 1992 | IMPROVE LUBRICATION PRACTICES | $257 | $0 | Implemented |
UD0365 # 01 Y:1992 | 01 | 1992 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $796 | $1,000 | Implemented |
UD0365 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,524 | $6,400 | Implemented |
UD0365 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $2,340 | $0 | Implemented |
UD0359 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,096 | $0 | Implemented |
UD0359 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,528 | $0 | Implemented |
UD0359 # 03 Y:1991 | 03 | 1991 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $10,541 | $10,000 | Implemented |
UD0360 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $3,936 | $4,500 | Not Implemented |
UD0360 # 02 Y:1991 | 02 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,115 | $0 | Not Implemented |
UD0360 # 03 Y:1991 | 03 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $931 | $0 | Not Implemented |
UD0360 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $885 | $0 | Not Implemented |
UD0360 # 05 Y:1991 | 05 | 1991 | REPLACE BOILER | $13,756 | $0 | Not Implemented |
UD0356 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,491 | $0 | Not Implemented |
UD0356 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,964 | $0 | Not Implemented |
UD0356 # 03 Y:1991 | 03 | 1991 | KEEP LAMPS AND REFLECTORS CLEAN | $4,191 | $0 | Not Implemented |
UD0356 # 04 Y:1991 | 04 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,390 | $0 | Not Implemented |
TN0446 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $5,675 | $2,700 | Implemented |
TN0446 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,089 | $1,590 | Implemented |
TN0446 # 03 Y:1991 | 03 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $507 | $0 | Implemented |
TN0446 # 04 Y:1991 | 04 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $488 | $165 | Implemented |