Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0166 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,328 | $5,000 | Not Implemented |
NC0166 # 05 Y:1999 | 05 | 1999 | INSULATE FEEDWATER TANK | $328 | $340 | Implemented |
NC0166 # 06 Y:1999 | 06 | 1999 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $645 | $800 | Not Implemented |
NC0166 # 07 Y:1999 | 07 | 1999 | BURN WOOD BY-PRODUCTS FOR HEAT | $12,902 | $62,200 | Not Implemented |
NC0166 # 08 Y:1999 | 08 | 1999 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $29,365 | $82,000 | Not Implemented |
NC0166 # 09 Y:1999 | 09 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $14,000 | $15,500 | Implemented |
NC0166 # 10 Y:1999 | 10 | 1999 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $7,700 | $1,000 | Implemented |
IA0223 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,307 | $2,670 | n/a |
IA0223 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,129 | $275 | n/a |
IA0223 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,841 | $0 | n/a |
IA0223 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,282 | $653 | n/a |
IA0223 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $50 | n/a |
IA0223 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $144 | $732 | n/a |
IA0223 # 07 Y:1999 | 07 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $17,424 | $7,400 | n/a |
IA0223 # 08 Y:1999 | 08 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $70,029 | $25,372 | n/a |
IA0223 # 09 Y:1999 | 09 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $40,016 | $218 | n/a |
IA0223 # 10 Y:1999 | 10 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $3,779 | $1,400 | n/a |
GT0666 # 01 Y:1999 | 01 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $30,744 | $35,000 | Implemented |
GT0666 # 02 Y:1999 | 02 | 1999 | ADJUST BURNERS FOR EFFICIENT OPERATION | $366,782 | $180,000 | Implemented |
GT0666 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,440 | $450 | Implemented |
GT0666 # 04 Y:1999 | 04 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,598 | $2,500 | Implemented |
GT0666 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $30,735 | $8,017 | Not Implemented |
GT0666 # 06 Y:1999 | 06 | 1999 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,354 | $3,900 | Not Implemented |
GT0666 # 07 Y:1999 | 07 | 1999 | INSULATE BARE EQUIPMENT | $7,967 | $8,398 | Not Implemented |
GT0666 # 08 Y:1999 | 08 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $38,797 | $151,526 | Implemented |