IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0211 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $1,000 Not Implemented
BD0211 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $274 Implemented
BD0211 # 08 Y:2002 08 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $32,683 $40,000 Not Implemented
BD0211 # 09 Y:2002 09 2002 CLEAR AND RENT EXISTING SPACE $7,500 $1,000 Not Implemented
TA0030 # 01 Y:2002 01 2002 ELIMINATE SHIFT $6,585 $0 Not Implemented
TA0030 # 02 Y:2002 02 2002 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $6,400 $8,400 Implemented
TA0030 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,370 $40 Implemented
TA0030 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $940 $150 Implemented
TA0030 # 05 Y:2002 05 2002 USE SYNTHETIC LUBRICANT $470 $0 Implemented
TA0030 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $120 $130 Not Implemented
TA0029 # 01 Y:2002 01 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $58,202 $0 Implemented
TA0029 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $49,028 $7,280 Implemented
TA0029 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,400 Implemented
TA0029 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,695 $870 Not Implemented
TA0029 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $1,490 $223 Implemented
TA0029 # 06 Y:2002 06 2002 COVER OPEN TANKS $430 $381 Not Implemented
UD0645 # 01 Y:2002 01 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $64,277 $3,300 n/a
UD0645 # 02 Y:2002 02 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,640 $1,000 n/a
UD0645 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,252 $0 n/a
UD0645 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $10,178 $2,325 n/a
UD0645 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,257 $363 n/a
UD0645 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,431 $7,030 n/a
UD0645 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,965 $0 n/a
UD0645 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,344 $2,000 n/a
UD0645 # 09 Y:2002 09 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $359 $30 n/a