IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0031 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $96,700 $195,000 Not Implemented
IC0031 # 10 Y:2002 10 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,201 $45,000 Not Implemented
UD0610 # 01 Y:2001 01 2001 IMPROVE SPACE COMFORT CONDITIONING $101,536 $402,000 Implemented
UD0610 # 02 Y:2001 02 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $95,666 $2,550 Not Implemented
UD0610 # 03 Y:2001 03 2001 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $28,005 $12,000 Not Implemented
UD0610 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,646 $1,500 Not Implemented
UD0610 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,232 $0 Not Implemented
UD0610 # 06 Y:2001 06 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,028 $0 Not Implemented
UD0610 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,984 $6,000 Implemented
UD0610 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,387 $500 Not Implemented
ND0365 # 01 Y:2000 01 2000 INCREASE EFFICIENCY OF TRUCKS $3,969 $28,000 Not Implemented
ND0365 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $120 Implemented
ND0365 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $883 $500 Not Implemented
ND0365 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $400 Not Implemented
ND0365 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $400 Not Implemented
ND0365 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $216 $200 Not Implemented
ND0365 # 07 Y:2000 07 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,656 $250 Not Implemented
ND0365 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $1,000 Not Implemented
ND0365 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $187 $350 Not Implemented
ND0365 # 10 Y:2000 10 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $428 $2,569 Not Implemented
ND0366 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,569 $600 Not Implemented
ND0366 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,894 $600 Not Implemented
ND0366 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $350 Not Implemented
ND0366 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,250 $160 Implemented
ND0351 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,844 $250 Not Implemented